Prospects for the Use of BIM Technologies at All Stages of the Life Cycle of an Investment and Construction Project

https://doi.org/10.23947/2949-1835-2023-2-1-44-54

Abstract

Introduction. At the present stage, domestic enterprises in the construction industry are faced with a number of difficulties. The increased uncertainty of the economic situation in the country forces the organizations of the construction sector, when implementing investment and construction projects, to adapt to newly emerging circumstances, shorten the planning horizon, and apply modern technologies and management methods. BIM technologies demonstrate their effectiveness at all stages of the life cycle of construction projects, which makes them promising to use in the current realities.
Materials and Methods. The possibilities of using BIM technologies in construction projects are becoming wider - from the familiar design using digital models to the creation of extensive databases used in modeling the processes of operation of objects, their reconstruction or demolition. Today, BIM technologies are an effective tool for achieving the internal goals of construction organizations and for organizing effective interaction with the end user of construction products.
Results. The use of BIM technologies makes it possible to make effective technical, organizational and technological decisions, both in strategic planning and in operational management during the implementation of investment and construction projects. Information modeling technologies save resources at all stages of the project life cycle, but the best results can be achieved with an integrated approach to their implementation.
Discussion and Conclusions. Having been widely used in foreign construction practice, BIM technologies make it possible to reduce the total cost and timing of the implementation of investment and construction projects and at the same time improve the quality of design and survey work and construction and installation work. Qualitative and quantitative benefits for organizations in the construction industry in the implementation of information modeling technologies determine the interest in them from Russian companies. In the context of active digital transformation, including with the support of the state, BIM technologies are becoming a tool for optimizing the activities of construction enterprises in the implementation of investment and construction projects at each of their stages, as well as increasing the competitiveness of firms in the domestic and foreign markets.

About the Authors

I. Yu. Zilberova
Don State Technical University
Russian Federation

1, Gagarin Sq., Rostov-on-Don



I. V. Novoselova
Don State Technical University
Russian Federation

1, Gagarin Sq., Rostov-on-Don



V. D. Mailyan
Southern Federal University
Russian Federation

105/42, B. Sadovaya St., Rostov-on-Don



K. S. Petrov
Don State Technical University
Russian Federation

1, Gagarin Sq., Rostov-on-Don



A. E. Shvets
Don State Technical University
Russian Federation

1, Gagarin Sq., Rostov-on-Don



References

1. Ivanova, D. G. The investment process features in housing construction of municipalities / D. G. Ivanova, O. E. Ivanova, S. A. Sukhinin // IOP Conference Series: Materials Science and Engineering. — 2020. — Vol. 913. — P. 052017. — DOI: https://doi.org/10.1088/1757-899X/913/5/052017.

2. Zelentsov, L. Methodology of making organizational and technological decisions at the stage of operational management of construction operations based on the forecasting system / L. Zelentsov, L. Mailyan, D. Pirko // Journal of Physics: Conference Series. — 2021. — Vol. 213. — P. 022114. — DOI: https://doi.org/10.1088/1742-6596/2131/2/022114.

3. Никулина, О. В. Принципы экономической безопасности в аспекте управления строительством / О. В. Никулина // Инженерный вестник Дона. — 2017. — № 4 (47). — С. 216.

4. Integration of BIM and GIS technologies for sustainable development of the construction industry / S. Sheina, K. Chubarova, D. Dementeev, A. Kalitkin // Lecture Notes in Networks and Systems. — 2022. — Pp. 1303–1311. — DOI: https://doi.org/10.1007/978-3-031-11058-0_132.

5. Kluchnikova, O. Rationalization of strategic management principles as a tool to improve a construction company services / O. Kluchnikova, O. Pobegaylov // Procedia Engineering. — 2016. — Vol. 150. — Pp. 2173–2177. — DOI: https://doi.org/10.1016/j.proeng.2016.07.259.

6. Томашук, Е. А. Влияние факторов рисков и неопределенности на работу строительного производства/ Е. А. Томашук, Д. В. Шишкунова // Научное обозрение. — 2013. — № 11. — С. 165–168.

7. BIM implementation of a full life cycle of building / A. V. Mishchenko, E. P. Gorbaneva, M. A. Preobrazhensky, V. Y. Mishchenko // AIP Conference Proceedings. — 2022. — Vol. 2559. — P. 040006. — DOI: https://doi.org/10.1063/5.0099692.

8. Баркалов, С. А. Подход к оптимизации социально-экономической эффективности строительной инвестиционной программы / С. А. Баркалов, О. С. Перевалова // Системы управления и информационные технологии. — 2019. — № 2 (76). — С. 75–78.

9. Optimal order of construction of facilities in complex development with minimal additional costs / A. Mailyan, E. Korol, R. Petrosyan, D. Antoniadi // IOP Conference Series: Materials Science and Engineering. — 2020. — Vol. 896. — P. 012052. — DOI: https://doi.org/10.1088/1757-899X/896/1/012052.

10. Zilberova, I. Y. Methods and models of multi-criteria evaluation of design solutions for installation of special constructions, used for problem-solving of judicial construction and technical expertise / I. Y. Zilberova // Materials Science Forum. — 2018. — Vol. 931. — Pp. 834–839. — DOI: https://doi.org/10.4028/www.scientific.net/MSF.931.834.

11. 4D BIM for construction planning and environmental planning / S. Sheina, E. Seraya, V. Krikunov, N. Saltykov // E3S Web of Conferences. — 2019. — Vol. 110. — P. 01012. — DOI: https://doi.org/10.1051/e3sconf/201911001012.

12. Лушников, А. С. Оценка эффективности использования технологий информационного моделирования при реализации инвестиционно-строительных проектов / А. С. Лушников // Вестник гражданских инженеров. — 2016. — № 5 (58). — С. 186–194.

13. Курочка, П. Н. Механизмы управления рисками в сложных многоуровневых системах / П. Н. Курочка, Ч. Т. Хонг // Экономика и менеджмент систем управления. — 2015. — № 2 (16). — С. 53–60.

14. Organizational and technological computeraided process of real estate management / L. Girya, E. Zorenko, N. Ulianov [et. al.] // E3S Web of Conferences. – 2021. — Vol. 263. — P. 04032. — DOI: https://doi.org/10.1051/e3sconf/202126304032.

15. Совершенствование процесса строительства с использованием BIM-технологий / Л. Б. Зеленцов, К. А. Цапко, И. Ф. Беликова, Д. В. Пирко // Инженерный вестник Дона. — 2020. — № 3 (63). — С. 3.

16. Digital models of parametric structures / G. Kravchenko, L. Panasyuk, E. Trufanova, L. Pudanova // Journal of Physics: Conference Series. — 2021. — Vol. 2131. — P. 022118. — DOI: https://doi.org/10.1088/1742-6596/2131/2/022118.

17. Никитина, Е. А. Внедрение BIM-технологий в сметную документацию / Е. А. Никитина // Инженерный вестник Дона. — 2020. — № 12 (72). — С. 1–9.

18. Шеина, С. Г. Пример применения BIM-технологий при обследовании зданий и сооружений / С. Г. Шеина, Е. В. Виноградова, Ю. С. Денисенко // Инженерный вестник Дона. — 2021. — № 6 (78). — С. 340–346.

19. Sevryukova, K. S. Factor systems simulation at all phases of an energy-efficient project life cycle / K. S. Sev-ryukova, E. P. Gorbaneva, V. Y. Mishchenko // AIP Conference Proceedings. — 2022. — Vol. 2559. — P. 040009. — DOI: https://doi.org/10.1063/5.0099693.

20. Анализ сферы управления проектами строительной деятельности / Л. В. Гиря, Т. Ш. Ахобадзе, Е. П. По-пов [и др.] // Инженерный вестник Дона. — 2020. — № 11. — С. 56–63.


Review

For citations:


Zilberova I.Yu., Novoselova I.V., Mailyan V.D., Petrov K.S., Shvets A.E. Prospects for the Use of BIM Technologies at All Stages of the Life Cycle of an Investment and Construction Project. Modern Trends in Construction, Urban and Territorial Planning. 2023;2(1):44-53. (In Russ.) https://doi.org/10.23947/2949-1835-2023-2-1-44-54

Views: 1418


Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 License.


ISSN 2949-1835 (Online)